Advances in Project Financing
Transportation projects, mainly toll roads, dominated the numbers and the
value of projects in high income & developing countries.
For middle & low income countries, independent power projects are
likely to be an important focus for future project financing.
Water & environmental infrastructure is another growth area projects are
being undertaken in middle income countries.
A public private partnership has made possible the construction of a
chemical waste treatment & disposal facility south of Jakarta in
Indonesia.
Jakarta in Indonesia A public private partnership has made possible the
construction of a chemical waste treatment & disposal
facility.
The countries of East Asia &
the Pacific Rim
Biggest users of standalone, limited recourse projects
in the next decade.
China Estimated to have as many as fifty projects under way
Adapting Project Finance Techniques
Differences in project, country & sectoriel characteristics influences…
1. The availability of finance
2. The instruments of risk allocation
3. The degree & nature of government involvement
The main sectoral divide is between toll roads & all other projects.
Toll road financing requires greater government involvement than do other
infrastructure projects.
Factors which effect the availability of project finance are …
1. Project Size
2. Risks in projects
3. Credibility of contractors
Project Size
In middle income countries, average project sizes are more than 25 %
smaller. The interface is that transaction costs in middle income countries
are lower, making smaller projects more feasible.
Large projects can create serious problems in low income countries.
Hum River Project in Pakistan The country’s first private power project.
After completion – the largest private power facilities
in the world
Sri Lankan Power Project Example of private infrastructure investment
Small project (44 megawatts) & foreign & local
entrepreneurs involved are technically.
Credible contracts
Project financing is a key mechanism for initiating a process of change in
countries or sectors with limited track records in private infrastructure
provision.
The Philippines – Privately financed power projects.
Philippines now have an extensive and sophisticated, legal and
administrative environment for independent power sophisticated, legal and
administrative environment for independent power projects.
An important additional element of contractual effectiveness is the
mechanism for resolving disputes.
Contracts for the Hopewell Shajiao C Power station in China were drawn
up using Honk Kong law.
Example to Toll Roads
Mexico 4000 KM of new toll roads at a cost of $ 10 billion
Malaysia Most expensive public private project in the developing world
North south Toll Motorway
China Planning may ambitious toll roads
123 KM $1 billion – Guangzhou Shenzen superhighway – Cut through
the heart of fast developing Guagdong Province
Shadow Tolls – Tolls paid from government revenues on the basis of
traffic flows
The Mexican toll road program illustrates the dangers of launching a
major initiative with multiple objectives and insufficient preparation.
Argentina has developed an extensive system of private concessions in
which tolls are charged to finance maintenance.
Institutions & Instruments for Resource Mobilization
Sources of Funds
Synergistic links can develop between private infrastructure projects &
domestic financial intermediation through capital markets.
The financing of infrastructure projects improves appraisal capabilities &
expands risk diversification possibilities for local commercial banks, equity
& bond markets and institutional investors such as insurance companies &
pension funds.
Friday, December 21, 2007
The Need for New Approaches
The Need for New Approaches
In the coming decade, demand for infrastructure investments will
simultaneously increase in two different sets of countries…
1. That have undertaken macroeconomic adjustment with consequent
low investment levels
2. That whose rapid growth is now placing a heavy burden on
infrastructure.
Infrastructure investment in developing countries – 4 % of GDP
A special factor increasing investment demand in many countries is the
rapid pace of urbanization, requiring investments in water supply as well
as waste treatment & disposal.
In Asia – The share of infrastructure investment in GDP is expected to
rise from 4 % today to more than 7 % in next few years
China – had set a target of installing at least 5 million telephone lines
annually up to 1995 & at least 8 million lines per year thereafter
Private Entrepreneurship : Trends & Opportunities [P 8]
After decades of severe regulatory restriction, private entrepreneurship in
infrastructure bounced back in two ways during the late 1980s.
1. Through the privatization of state owned utilities
2. Through policy reform that made possible the construction of new facilities
in competition with, or as a complement to, existing enterprises.
Privatized telecommunications & electricity utilities in Latin America & Asia
are undertaking large and growing new investments.
Greenfield Projects – The road & electric power sector – Has grown
rapidly.
IFC – International Finance Corporation
Private finance is proportionately greater in Latin America than in other
regions & larger in telecommunications & electric power generation than in
other sectors.
Public private partnerships in some ways represent a return to the
nineteenth century, where infrastructure projects were privately financed
in much of the world while government support acted as stimulant.
The Spread of Project Financing : Achievements & Lessons
"Special purpose corporations" which brings together private sponsors &
other equity holders builds many new infrastructure projects in the private
sector.
Objectives of Project Financing
1. Providing funds to a project is an important objective
2. Monitoring by financial markets & institutions complements regulation
& competition in service delivery.
3. It provides another mechanism for investors to impose discipline.
4. Norms for devising incentive & penalty mechanisms to ensure
performance by private sector interests are becoming clearer.
5. Privately sponsored & financed projects measure their success against
contractually agreed targets for new capacity, construction costs and
time overruns and against indicators of service quality.
Concepts & Trends in Project
Established companies – Such as privatized telecommunications &
electric power utilities – have a credit history, a customer base & tangible
asses that can be offered as security to lenders.
New companies as in electric power generation, toll roads or
environmental infrastructure have only the prospect of a future earning
stream to support borrowings.
Non Recourse – The financing of a project when lenders are repaid only
from the cash flow generated by the project or in the event of complete
failure, from the value of the project’s assets.
Limited Recourse – Lenders may also have limited recourse to the
assets of a parent company sponsoring a project.
The use of non recourse or limited recourse financing also known as
project financing. Financing in this form can be complex & time
consuming, as the interests of various parties have to be secured through
contractual agreements.
The equity stake of private sponsors is typically about 30 % of project
costs & usually forms the limit of their liability.
Private performance guarantees from project sponsors.
In the coming decade, demand for infrastructure investments will
simultaneously increase in two different sets of countries…
1. That have undertaken macroeconomic adjustment with consequent
low investment levels
2. That whose rapid growth is now placing a heavy burden on
infrastructure.
Infrastructure investment in developing countries – 4 % of GDP
A special factor increasing investment demand in many countries is the
rapid pace of urbanization, requiring investments in water supply as well
as waste treatment & disposal.
In Asia – The share of infrastructure investment in GDP is expected to
rise from 4 % today to more than 7 % in next few years
China – had set a target of installing at least 5 million telephone lines
annually up to 1995 & at least 8 million lines per year thereafter
Private Entrepreneurship : Trends & Opportunities [P 8]
After decades of severe regulatory restriction, private entrepreneurship in
infrastructure bounced back in two ways during the late 1980s.
1. Through the privatization of state owned utilities
2. Through policy reform that made possible the construction of new facilities
in competition with, or as a complement to, existing enterprises.
Privatized telecommunications & electricity utilities in Latin America & Asia
are undertaking large and growing new investments.
Greenfield Projects – The road & electric power sector – Has grown
rapidly.
IFC – International Finance Corporation
Private finance is proportionately greater in Latin America than in other
regions & larger in telecommunications & electric power generation than in
other sectors.
Public private partnerships in some ways represent a return to the
nineteenth century, where infrastructure projects were privately financed
in much of the world while government support acted as stimulant.
The Spread of Project Financing : Achievements & Lessons
"Special purpose corporations" which brings together private sponsors &
other equity holders builds many new infrastructure projects in the private
sector.
Objectives of Project Financing
1. Providing funds to a project is an important objective
2. Monitoring by financial markets & institutions complements regulation
& competition in service delivery.
3. It provides another mechanism for investors to impose discipline.
4. Norms for devising incentive & penalty mechanisms to ensure
performance by private sector interests are becoming clearer.
5. Privately sponsored & financed projects measure their success against
contractually agreed targets for new capacity, construction costs and
time overruns and against indicators of service quality.
Concepts & Trends in Project
Established companies – Such as privatized telecommunications &
electric power utilities – have a credit history, a customer base & tangible
asses that can be offered as security to lenders.
New companies as in electric power generation, toll roads or
environmental infrastructure have only the prospect of a future earning
stream to support borrowings.
Non Recourse – The financing of a project when lenders are repaid only
from the cash flow generated by the project or in the event of complete
failure, from the value of the project’s assets.
Limited Recourse – Lenders may also have limited recourse to the
assets of a parent company sponsoring a project.
The use of non recourse or limited recourse financing also known as
project financing. Financing in this form can be complex & time
consuming, as the interests of various parties have to be secured through
contractual agreements.
The equity stake of private sponsors is typically about 30 % of project
costs & usually forms the limit of their liability.
Private performance guarantees from project sponsors.
Old Ways of Financing Infrastructure
Old Ways of Financing
Governments have been bearing more of the burden of infrastructure
expenditure than they can reasonably be expected to manage.
Under today’s tax system – Tax revenues & government borrowings
are the predominant source of infrastructure finance.
Borrowing – Whether from official or private sources is backed by a
government’s full faith & credit and thus by its tax powers.
Under this system – Government bear virtually all risks associated
with infrastructure financing.
Private sponsorship & financing offer the twin benefits of additional funds
and more efficient provision especially valuable because substantial new
investments are needed to meet the demand.
Today’s Financing Patterns
Developing countries are spending billions of amount on infrastructure
development.
90% or more of it is derived from government tax revenues or
intermediated by governments.
Infrastructure’s share of total government investment is rarely less than
30 % and sometimes as much as 70 %.
External Finance – Used primarily to import needed equipment
In the electric power & Telecommunications sectors
External Borrowing – often reflects macroeconomic constraints
Used to finance local expenditures for construction, equipment &
Maintenance
The Dominican Republic – One of several countries with a very heavy
reliance on foreign funding.
Limitations of the Present System
The main advantage of the present system is that
1. In most counries the government is the most creditworthy entity and
2. Is able to borrow at the lowest rates, making possible infrastructure
projects that might not other wise be financially viable.
Balanced against this advantage has been
1. The difficulty of maintaining accountability.
2. Leading often to high costs of provision for the consumer.
3. Moreover, being creditworthy does not imply that governments have
unlimited access to resources.
Reasons why governments may be well advised to entrust to private
sponsorship those infrastructure investments that can be undertaken by
private entrepreneurs.
Government’s ability to spend on infrastructure has been severely
constrained, in part because Poor performance and pricing have strained
government budget.
International donor policies and practices have sometimes reinforced
distortions in recipient countries. Many donors have focused on financing
new physical construction rather than on maintaining or improving existing
infrastructure.
A World Bank review of urban water supply & sanitation projects identified
problems like……
1 Serious Cost overruns The group of projects as a whole cost 33 % more than
the appraisal estimates
2 Time Overruns 46 % of the projects required two to four extra years to
complete
3 Maintenance was severely neglected because of lack of funds that created
shortages of skilled staff and spare parts.
4 The review found that borrowers had often failed to comply with loan
covenants, especially those relating to pricing & financial performance.
The full or partial tying of aid – The requirement that funds be spent on
goods or services purchased only form specified countries.
DAC – Development Assistance Committee
Governments have been bearing more of the burden of infrastructure
expenditure than they can reasonably be expected to manage.
Under today’s tax system – Tax revenues & government borrowings
are the predominant source of infrastructure finance.
Borrowing – Whether from official or private sources is backed by a
government’s full faith & credit and thus by its tax powers.
Under this system – Government bear virtually all risks associated
with infrastructure financing.
Private sponsorship & financing offer the twin benefits of additional funds
and more efficient provision especially valuable because substantial new
investments are needed to meet the demand.
Today’s Financing Patterns
Developing countries are spending billions of amount on infrastructure
development.
90% or more of it is derived from government tax revenues or
intermediated by governments.
Infrastructure’s share of total government investment is rarely less than
30 % and sometimes as much as 70 %.
External Finance – Used primarily to import needed equipment
In the electric power & Telecommunications sectors
External Borrowing – often reflects macroeconomic constraints
Used to finance local expenditures for construction, equipment &
Maintenance
The Dominican Republic – One of several countries with a very heavy
reliance on foreign funding.
Limitations of the Present System
The main advantage of the present system is that
1. In most counries the government is the most creditworthy entity and
2. Is able to borrow at the lowest rates, making possible infrastructure
projects that might not other wise be financially viable.
Balanced against this advantage has been
1. The difficulty of maintaining accountability.
2. Leading often to high costs of provision for the consumer.
3. Moreover, being creditworthy does not imply that governments have
unlimited access to resources.
Reasons why governments may be well advised to entrust to private
sponsorship those infrastructure investments that can be undertaken by
private entrepreneurs.
Government’s ability to spend on infrastructure has been severely
constrained, in part because Poor performance and pricing have strained
government budget.
International donor policies and practices have sometimes reinforced
distortions in recipient countries. Many donors have focused on financing
new physical construction rather than on maintaining or improving existing
infrastructure.
A World Bank review of urban water supply & sanitation projects identified
problems like……
1 Serious Cost overruns The group of projects as a whole cost 33 % more than
the appraisal estimates
2 Time Overruns 46 % of the projects required two to four extra years to
complete
3 Maintenance was severely neglected because of lack of funds that created
shortages of skilled staff and spare parts.
4 The review found that borrowers had often failed to comply with loan
covenants, especially those relating to pricing & financial performance.
The full or partial tying of aid – The requirement that funds be spent on
goods or services purchased only form specified countries.
DAC – Development Assistance Committee
The Challenges of Commercialization and Risk Profile of Infrastructure
The commercialization of infrastructure projects can format on the basis
that recovery of investments is through a system of user charges. Such
user charges bear a direct relation to the specific benefits that the facility
provides the user.
Large errors have been made in different countries, either over
investment in infrastructure much before the actual appearance of
demand or, conversely, under investment because of failure to anticipate
the demand.
Commercialization would necessitate a demand orientation. The
challenge for policy is on the one hand , to find appropriate market signals
which indicate the future trends of infrastructure demand, and on the
other, to coordinate the supply ins such a manner that investment in these
crucial sectors is made in an efficient manner which ten provides
appropriate returns.
Risk Profile of Infrastructure Projects
The crucial elements in the financing of infrastructure investment is first
assessing the severity of each risk and then identifying the party in the
best position to manage a risk.
1) Development
Risk
The initial very high risk phase where only equity capital can be
used for financing.
2) Construction
Risk
The next high risk phase where cost & time spillovers tend to
distort the future revenue generation & profitability prospects of the
project
The construction phase may be financed by a combination of
equity & debt with guarantees.
3) Operating
Risk
This risk emerges due to underestimation of operating cost &
occasionally, an overestimation of the output from the proposed
infrastructure facility.
Besides the above, there are other risks…..
1) Demand Risk This is a result of an overestimation of the demand &
"Willingness to pay" for the proposed infrastructure facility.
Example _ The toll road network in Mexico
2) Financial Risk Of specific relevance to infrastructure projects are foreign
exchange & interest rate risks.
3) Market Risk This is important when consumers can choose alternative
services such as with toll roads, railways, and even ports.
4) Political Risk Inadequate clarity in Government policies & selection
procedures had made political risk the fulcrum of infrastructure
development.
This is primarily due to the nature of the transaction & negotiation
costs involved, which rarely vary with the size
of the project.
The Operation phase may, in turn be divided as follows.
1) Introductory
Operation Phase
During this phase, the revenue stream is thin & operational
bottlenecks hinder achievement of high capacity utilization.
2) Project
Stabilization Phase
During this phase, the risks reduce considerably & revenues are
more steady and predictable.
The Historical Prominence of the Public Sector
Public lighting is characteristically provided by public authorities & is
generally financed by some form of tax revenues.
Certain long distance highways, which are built for exclusive use by those
who pay for their use.
Power and water supply networks, telecommunications, sanitations and
sewerage, all have elements of monopoly built into them.
Infrastructure provision usually involves high front costs & long payback
periods. Investments are typically bulky & lumpy. This has two
implications. Second, in view of a long payback period, he has to be
capable of obtaining matching long term finance.
o First, the investor has to have a large initial capital.
o Second, in view of a long payback period, he has to be capable of
obtaining matching long term finance.
o Rent regulation came into being with Gladstone’s 1844 Railway Act,
followed by dividend limitations to 10 % for gas & water companies
under the 1847 Gas Works & Water Works Acts. Similarly, limits on
prices or returns were introduced in Canada (Toronto) for town gas
and in some United Sates railroad situates around the middle of the
century.
New Approaches
Delivery of Infrastructure Systems
The dependence on budgetary allocations has been essentially
responsible for delays in the implementation of projects, due to the
resultant non availability of funds on time.
Insufficient maintenance, misallocated investment, unresponsiveness to
users & technical inefficiencies present issues, which need to be
addressed to improve delivery.
Stages in Development
The development of infrastructure projects typically involves three distinct
phases…
1. Project identification & planning
2. Detailed design & execution
3. Operation & Maintenance
Projects are identified by various ministries of the Central / State
Governments based on proposals put up by local organizations, which act
as their operational arms.
The detailed design & implementation of projects is carried out by
governmental departments & organizations which work under the
supervision of the concerned ministry.
Examples _ NOIDA, CIDCO, NCRB, and innumerable state level
Organizations.
NOIDA New Okhal Industrial Development Authority
CIDCO City & Industrial Development Corporation Limited
NCRB National Capital Region Board
The operation & maintenance of the projects are usually carried out by the
same organizations that implement the project. Thus the DoT, MTNL and
VSNL provide & maintain the telephone network, while the same
function is discharged in the transport sector by the PWDs and in the
Power sector, primarily by the SEBs.
Incentive Structure for Efficient Service Delivery
To ensure efficient, responsive delivery of services, incentives need to be
changed through the application of three instruments.
1. Commercial Management
2. Competition
3. Stakeholder involvement
The high willingness to pay for some services provides greater opportunity
for user charges, private sector involvement in management financing or
ownership.
A fundamental feature of competitive markets is that they provide
incentives & disincentives for effective institutional performance.
The Organizational Framework
To achieve integration in project implementation, it is necessary to create
organizations to implement the projects. Such organizations would fulfill
six objectives.
1. To identify specific projects that could be taken p for commercial
implementation.
2. To seek additionally in resources with respect to implementation of
projects so identified.
3. To ensure project management & implementation along professional
lies.
4. To attract new & appropriate technologies.
5. To seek skills up gradation with respect to project conceptualization,
techniques, costing, maintenance & aesthetics...
6. To promote the implementation of major projects under a self
sustaining format in conjunction with local authorities and
municipalities.
that recovery of investments is through a system of user charges. Such
user charges bear a direct relation to the specific benefits that the facility
provides the user.
Large errors have been made in different countries, either over
investment in infrastructure much before the actual appearance of
demand or, conversely, under investment because of failure to anticipate
the demand.
Commercialization would necessitate a demand orientation. The
challenge for policy is on the one hand , to find appropriate market signals
which indicate the future trends of infrastructure demand, and on the
other, to coordinate the supply ins such a manner that investment in these
crucial sectors is made in an efficient manner which ten provides
appropriate returns.
Risk Profile of Infrastructure Projects
The crucial elements in the financing of infrastructure investment is first
assessing the severity of each risk and then identifying the party in the
best position to manage a risk.
1) Development
Risk
The initial very high risk phase where only equity capital can be
used for financing.
2) Construction
Risk
The next high risk phase where cost & time spillovers tend to
distort the future revenue generation & profitability prospects of the
project
The construction phase may be financed by a combination of
equity & debt with guarantees.
3) Operating
Risk
This risk emerges due to underestimation of operating cost &
occasionally, an overestimation of the output from the proposed
infrastructure facility.
Besides the above, there are other risks…..
1) Demand Risk This is a result of an overestimation of the demand &
"Willingness to pay" for the proposed infrastructure facility.
Example _ The toll road network in Mexico
2) Financial Risk Of specific relevance to infrastructure projects are foreign
exchange & interest rate risks.
3) Market Risk This is important when consumers can choose alternative
services such as with toll roads, railways, and even ports.
4) Political Risk Inadequate clarity in Government policies & selection
procedures had made political risk the fulcrum of infrastructure
development.
This is primarily due to the nature of the transaction & negotiation
costs involved, which rarely vary with the size
of the project.
The Operation phase may, in turn be divided as follows.
1) Introductory
Operation Phase
During this phase, the revenue stream is thin & operational
bottlenecks hinder achievement of high capacity utilization.
2) Project
Stabilization Phase
During this phase, the risks reduce considerably & revenues are
more steady and predictable.
The Historical Prominence of the Public Sector
Public lighting is characteristically provided by public authorities & is
generally financed by some form of tax revenues.
Certain long distance highways, which are built for exclusive use by those
who pay for their use.
Power and water supply networks, telecommunications, sanitations and
sewerage, all have elements of monopoly built into them.
Infrastructure provision usually involves high front costs & long payback
periods. Investments are typically bulky & lumpy. This has two
implications. Second, in view of a long payback period, he has to be
capable of obtaining matching long term finance.
o First, the investor has to have a large initial capital.
o Second, in view of a long payback period, he has to be capable of
obtaining matching long term finance.
o Rent regulation came into being with Gladstone’s 1844 Railway Act,
followed by dividend limitations to 10 % for gas & water companies
under the 1847 Gas Works & Water Works Acts. Similarly, limits on
prices or returns were introduced in Canada (Toronto) for town gas
and in some United Sates railroad situates around the middle of the
century.
New Approaches
Delivery of Infrastructure Systems
The dependence on budgetary allocations has been essentially
responsible for delays in the implementation of projects, due to the
resultant non availability of funds on time.
Insufficient maintenance, misallocated investment, unresponsiveness to
users & technical inefficiencies present issues, which need to be
addressed to improve delivery.
Stages in Development
The development of infrastructure projects typically involves three distinct
phases…
1. Project identification & planning
2. Detailed design & execution
3. Operation & Maintenance
Projects are identified by various ministries of the Central / State
Governments based on proposals put up by local organizations, which act
as their operational arms.
The detailed design & implementation of projects is carried out by
governmental departments & organizations which work under the
supervision of the concerned ministry.
Examples _ NOIDA, CIDCO, NCRB, and innumerable state level
Organizations.
NOIDA New Okhal Industrial Development Authority
CIDCO City & Industrial Development Corporation Limited
NCRB National Capital Region Board
The operation & maintenance of the projects are usually carried out by the
same organizations that implement the project. Thus the DoT, MTNL and
VSNL provide & maintain the telephone network, while the same
function is discharged in the transport sector by the PWDs and in the
Power sector, primarily by the SEBs.
Incentive Structure for Efficient Service Delivery
To ensure efficient, responsive delivery of services, incentives need to be
changed through the application of three instruments.
1. Commercial Management
2. Competition
3. Stakeholder involvement
The high willingness to pay for some services provides greater opportunity
for user charges, private sector involvement in management financing or
ownership.
A fundamental feature of competitive markets is that they provide
incentives & disincentives for effective institutional performance.
The Organizational Framework
To achieve integration in project implementation, it is necessary to create
organizations to implement the projects. Such organizations would fulfill
six objectives.
1. To identify specific projects that could be taken p for commercial
implementation.
2. To seek additionally in resources with respect to implementation of
projects so identified.
3. To ensure project management & implementation along professional
lies.
4. To attract new & appropriate technologies.
5. To seek skills up gradation with respect to project conceptualization,
techniques, costing, maintenance & aesthetics...
6. To promote the implementation of major projects under a self
sustaining format in conjunction with local authorities and
municipalities.
Massive Investment Requirements in Favor of Commercialization
Developing countries have to make massive investments of financial,
human & managerial resources in infrastructure.
Estimates vary substantially depending on definitions, methodology &
source of information as well as assumptions of what needs can & should
reasonably meet.
A recent World Bank study has estimated that developing countries as a
whole invest about $ 200 billion per year in physical infrastructure
facilities. This is about 4 % of their GDP.
4/5th of $ 200 billion $ 160 billion is financed through Domestic public resources
1/6th of $ 200 billion $ 25 billion is financed through International development assistance
$ 15 billion is financed through Private capital
Future investment needs are expected to be much higher because of
demand created by economic growth, rising population, rapid urbanization
as well as the need to reconstruct some economies and make up for lack
of adequate investment in other in the recent past.
The World Bank estimates that East Asian economies have steadily
increased infrastructure investment in absolute terms as the proportion of
GDP. Total investment rose as following…
1970 3.6 %
1980 4.6 %
1993 5 – 5.5 %
East Asian economies are expected to grow at an annual rate of 7-8 %.
As a result, infrastructure investments may have to increase from about 5
% of GDP to about 6
private sector
A wave of privatizatio.5 – 7% in the next 10 years.
Current situation in Favor of Commercialization and participation of then & deregulation has been sweeping infrastructure
sectors and the planet. These bold new approaches promise improved
efficiency and service quality.
The new wage …
In the 1970s US started deregulating natural gas, power & airlines.
During 1980s Chile, New Zealand & UK implemented far reaching
deregulation & privatization of almost all infrastructure sectors.
Since the late
1980s
At least 145 companies in 30 countries have been privatized &
at least 146 new projects in 34 countries significant private
participation started in power, natural gas, telecommunications,
roads and water.
The key driver is technological change, which has always influenced the
degree of competition possible.
Today, telecommunications is particularly affected as new transmission &
compression techniques allow private competition where monopoly once
reigned.
There are five basic pragmatic & non ideology related factors leading
countries across the world to consider enhanced commercialization of
infrastructure provision.
1. Massive investment needs
2. Managerial Constraints in the Public Sector
3. Changes in Technology
4. Globalization
5. New Dynamism in World Capital Markets
Massive Investment Needs
Future investment needs are projected to be much higher because of
demands created by rapid urbanization, and the need to make up for past
inadequate investment and most importantly, because of the high
economic growth rates.
The quest is to install more modern transport systems for the 21st century
using the latest technology. Such infrastructure is extremely capital
intensive; the only choice then is to go for increasing commercialization.
Managerial Constraints in the Public Sector
While there are well performing public utilities in some countries, the
quantity, quality & cost effectiveness of infrastructure services overall
have not kept up with the needs of either the general public or the
business community in most countries.
Change in Technology
Changes in technology, particularly in telecommunications, computers &
electronics now make it easier to change for marginal usage of services.
It has been possible to introduce competition particularly in log distance
services, whereas earlier, telecommunications was regarded as a natural
monopoly and therefore, suitable for public sector provision.
Similarly, smart cards, electronic billing, etc are making it possible to
potentially charge for road usage on a marginal basis without disruption
caused to traffic by toll booths.
Technology changes have made it possible to unbundled infrastructure
services. Different firms can provide different telecommunication services
such as international, domestic, long distance, local services, and other
value added services.
In power, it is now quite easy to separate generators from transmission
providers and distributors.
Globalization
Many surveys of transnational corporations have indicated that the quality
and cost of infrastructure is one of the primary considerations in their
decisions as to where new investments should be located.
Adequate quantity & reliability of infrastructure are key factors in the ability
of countries to compete in international trade.
In India, the fright rates of container traffic and transit times through ports
exceed those of Asian competitors by large margins, which seriously
constrain the country’s export promotion goals. The main reason for this
poor performance lies in excessive regulation of trade and transport,
administrative practices & inefficient management by public transport
entities.
New Dynamism in World Capital Markets
The First World War, the Russian Revolution & the ensuring Soviet default
on Russia’s foreign debt, the Wall Street Crash of 1929, the resultant
Great Depression in the capitalist world, the bond failures of the 1930s
and the Second World War, all occurred in rapid succession within a
period of about 30 years.
There are many reasons for the increased flow of private resources from
the developed to the developing world. As the population of the OECD
countries has aged, contractual savings in the form of life insurance,
pension funds and the like have expanded very considerably.
In India, the government has now run a revenue deficit for many years.
GOI is borrowing from the market to finance even current expenditures.
Thus all government infrastructure expenditures are now being financed
by market borrowings.
human & managerial resources in infrastructure.
Estimates vary substantially depending on definitions, methodology &
source of information as well as assumptions of what needs can & should
reasonably meet.
A recent World Bank study has estimated that developing countries as a
whole invest about $ 200 billion per year in physical infrastructure
facilities. This is about 4 % of their GDP.
4/5th of $ 200 billion $ 160 billion is financed through Domestic public resources
1/6th of $ 200 billion $ 25 billion is financed through International development assistance
$ 15 billion is financed through Private capital
Future investment needs are expected to be much higher because of
demand created by economic growth, rising population, rapid urbanization
as well as the need to reconstruct some economies and make up for lack
of adequate investment in other in the recent past.
The World Bank estimates that East Asian economies have steadily
increased infrastructure investment in absolute terms as the proportion of
GDP. Total investment rose as following…
1970 3.6 %
1980 4.6 %
1993 5 – 5.5 %
East Asian economies are expected to grow at an annual rate of 7-8 %.
As a result, infrastructure investments may have to increase from about 5
% of GDP to about 6
private sector
A wave of privatizatio.5 – 7% in the next 10 years.
Current situation in Favor of Commercialization and participation of then & deregulation has been sweeping infrastructure
sectors and the planet. These bold new approaches promise improved
efficiency and service quality.
The new wage …
In the 1970s US started deregulating natural gas, power & airlines.
During 1980s Chile, New Zealand & UK implemented far reaching
deregulation & privatization of almost all infrastructure sectors.
Since the late
1980s
At least 145 companies in 30 countries have been privatized &
at least 146 new projects in 34 countries significant private
participation started in power, natural gas, telecommunications,
roads and water.
The key driver is technological change, which has always influenced the
degree of competition possible.
Today, telecommunications is particularly affected as new transmission &
compression techniques allow private competition where monopoly once
reigned.
There are five basic pragmatic & non ideology related factors leading
countries across the world to consider enhanced commercialization of
infrastructure provision.
1. Massive investment needs
2. Managerial Constraints in the Public Sector
3. Changes in Technology
4. Globalization
5. New Dynamism in World Capital Markets
Massive Investment Needs
Future investment needs are projected to be much higher because of
demands created by rapid urbanization, and the need to make up for past
inadequate investment and most importantly, because of the high
economic growth rates.
The quest is to install more modern transport systems for the 21st century
using the latest technology. Such infrastructure is extremely capital
intensive; the only choice then is to go for increasing commercialization.
Managerial Constraints in the Public Sector
While there are well performing public utilities in some countries, the
quantity, quality & cost effectiveness of infrastructure services overall
have not kept up with the needs of either the general public or the
business community in most countries.
Change in Technology
Changes in technology, particularly in telecommunications, computers &
electronics now make it easier to change for marginal usage of services.
It has been possible to introduce competition particularly in log distance
services, whereas earlier, telecommunications was regarded as a natural
monopoly and therefore, suitable for public sector provision.
Similarly, smart cards, electronic billing, etc are making it possible to
potentially charge for road usage on a marginal basis without disruption
caused to traffic by toll booths.
Technology changes have made it possible to unbundled infrastructure
services. Different firms can provide different telecommunication services
such as international, domestic, long distance, local services, and other
value added services.
In power, it is now quite easy to separate generators from transmission
providers and distributors.
Globalization
Many surveys of transnational corporations have indicated that the quality
and cost of infrastructure is one of the primary considerations in their
decisions as to where new investments should be located.
Adequate quantity & reliability of infrastructure are key factors in the ability
of countries to compete in international trade.
In India, the fright rates of container traffic and transit times through ports
exceed those of Asian competitors by large margins, which seriously
constrain the country’s export promotion goals. The main reason for this
poor performance lies in excessive regulation of trade and transport,
administrative practices & inefficient management by public transport
entities.
New Dynamism in World Capital Markets
The First World War, the Russian Revolution & the ensuring Soviet default
on Russia’s foreign debt, the Wall Street Crash of 1929, the resultant
Great Depression in the capitalist world, the bond failures of the 1930s
and the Second World War, all occurred in rapid succession within a
period of about 30 years.
There are many reasons for the increased flow of private resources from
the developed to the developing world. As the population of the OECD
countries has aged, contractual savings in the form of life insurance,
pension funds and the like have expanded very considerably.
In India, the government has now run a revenue deficit for many years.
GOI is borrowing from the market to finance even current expenditures.
Thus all government infrastructure expenditures are now being financed
by market borrowings.
Linkage to Poverty and Employment Generation
The impact on low income individual’s access to infrastructure depends on
the potions available, and the poor as a group have fewer or less
attractive options than the rich.
Alternative sources of service may be unavailable or unaffordable to the
poor.
Alternative sources such as water pump, private transport, kerosene
stoves or lighting or by moving to a better served nabourhood.
Public policies should aim at increasing the range of affordable options for
services of the type & quality required by the poor.
Impact on Technological Innovation
Information is considered a factor of production by itself and activities
involved with the processing & generation of information account for one
third to half of GDP & employment in OECD countries, and a growing
share of GDP in the modern sectors of LDCs.
Technological change, which has drastically reduced the cost of
communicating & expands the range of s services available, has also
reduced costs of transportation & many other telecommunications using
activities.
Employment Generation
To improve the welfare of the organized & unorganized labor, State could
consider some of the following options.
1. Promote small scale industries.
2. Increase the number of employment exchanges and job placement
agencies.
3. Facilitate investments by private sector for investements in vocational
training.
4. Promote training institutions & provide incentives for entrepreneurial
development.
5. Provide group insurance schemes for agriculture, construction and
unorganized workers.
Government initiatives - Employment
Following are the different schemes developed by the Government.
1) JRY Jawahar Rajgor Yojana
2) SJSRY Swarna Jayanti Shahari Rojgar Yojana
3) TRYSEM Training of Rural Youth for Self Employment
4) PMGY Pradhan Manti’s Gramodaya Yojana
Jawahar Rajgor Yojana (JRY)
In April 1989, GOI launched JRY after merging the National Rural
Employment Programme & Rural Landless Employment Guarantee
Programme.
The Second stream of JRY – Intensified Jawahar Rojgar Yojana – was
added in 1993 – 94.
The Third Stream of JRY – Innovative and Special Employment Scheme
(ISES), which was project specific.
Later JRY was modified to the Jawahar Gram Samriddhi Yojana.
The primary objective of these schemes is to provide employment to the
unemployed in the rural areas.
The secondary objective is the creation of sustained employment by
strengthening the rural economic infrastructure, creating community &
social assets, positive impact on wage levels & over all improvement in
the quality of life in rural Ares.
Income generating assets are created through a mix of bank credit.
The Ministry of Rural Development & Employment, GOI, administers
these schemes.
At the state level, the schemes are administrated by the rural department.
The commissioner Rural Development Department controls the
implementation & monitors the schemes.
District Rural Development Agencies (DRDAs) headed by the District
Magistrate in each district are responsible for implementation,
coordination and monitoring of the scheme in each district through
Panchayati Raj institutions & other executing agencies.
Swarna Jayanti Shahari Rojgar Yojana (SJSRY)
SJSRY aimed at providing gainful employment to urban employment and
unemployed.
SJSRY is funded on 75:25 bases between the center & the State.
Training of Rural Youth for Self Employment (TRYSEM)
The objective of this programme is to provide basic technical and
entrepreneurial skills to rural youth from families below the poverty line to
enable them to take up self employment/wage employment in the broad
fields of agriculture and allied sectors.
The target groups for this scheme are rural youths in the age group of 18-
35 years.
Pradhan Mantri’s Gramodaya Yojana (PMGY)
This scheme would focus on the creation of social & economical
infrastructure with the objective of improving the quality of life of people
especially in rural areas.
Programs related t health, education, drinking water; housing & rural
roads would be undertaken within this programme.
PMGY would have two components programme for rural connectivity with
50 % allocation and other programmes of primary health, primary
education, shelter, drinking water & nutrition being accorded the remaining
the potions available, and the poor as a group have fewer or less
attractive options than the rich.
Alternative sources of service may be unavailable or unaffordable to the
poor.
Alternative sources such as water pump, private transport, kerosene
stoves or lighting or by moving to a better served nabourhood.
Public policies should aim at increasing the range of affordable options for
services of the type & quality required by the poor.
Impact on Technological Innovation
Information is considered a factor of production by itself and activities
involved with the processing & generation of information account for one
third to half of GDP & employment in OECD countries, and a growing
share of GDP in the modern sectors of LDCs.
Technological change, which has drastically reduced the cost of
communicating & expands the range of s services available, has also
reduced costs of transportation & many other telecommunications using
activities.
Employment Generation
To improve the welfare of the organized & unorganized labor, State could
consider some of the following options.
1. Promote small scale industries.
2. Increase the number of employment exchanges and job placement
agencies.
3. Facilitate investments by private sector for investements in vocational
training.
4. Promote training institutions & provide incentives for entrepreneurial
development.
5. Provide group insurance schemes for agriculture, construction and
unorganized workers.
Government initiatives - Employment
Following are the different schemes developed by the Government.
1) JRY Jawahar Rajgor Yojana
2) SJSRY Swarna Jayanti Shahari Rojgar Yojana
3) TRYSEM Training of Rural Youth for Self Employment
4) PMGY Pradhan Manti’s Gramodaya Yojana
Jawahar Rajgor Yojana (JRY)
In April 1989, GOI launched JRY after merging the National Rural
Employment Programme & Rural Landless Employment Guarantee
Programme.
The Second stream of JRY – Intensified Jawahar Rojgar Yojana – was
added in 1993 – 94.
The Third Stream of JRY – Innovative and Special Employment Scheme
(ISES), which was project specific.
Later JRY was modified to the Jawahar Gram Samriddhi Yojana.
The primary objective of these schemes is to provide employment to the
unemployed in the rural areas.
The secondary objective is the creation of sustained employment by
strengthening the rural economic infrastructure, creating community &
social assets, positive impact on wage levels & over all improvement in
the quality of life in rural Ares.
Income generating assets are created through a mix of bank credit.
The Ministry of Rural Development & Employment, GOI, administers
these schemes.
At the state level, the schemes are administrated by the rural department.
The commissioner Rural Development Department controls the
implementation & monitors the schemes.
District Rural Development Agencies (DRDAs) headed by the District
Magistrate in each district are responsible for implementation,
coordination and monitoring of the scheme in each district through
Panchayati Raj institutions & other executing agencies.
Swarna Jayanti Shahari Rojgar Yojana (SJSRY)
SJSRY aimed at providing gainful employment to urban employment and
unemployed.
SJSRY is funded on 75:25 bases between the center & the State.
Training of Rural Youth for Self Employment (TRYSEM)
The objective of this programme is to provide basic technical and
entrepreneurial skills to rural youth from families below the poverty line to
enable them to take up self employment/wage employment in the broad
fields of agriculture and allied sectors.
The target groups for this scheme are rural youths in the age group of 18-
35 years.
Pradhan Mantri’s Gramodaya Yojana (PMGY)
This scheme would focus on the creation of social & economical
infrastructure with the objective of improving the quality of life of people
especially in rural areas.
Programs related t health, education, drinking water; housing & rural
roads would be undertaken within this programme.
PMGY would have two components programme for rural connectivity with
50 % allocation and other programmes of primary health, primary
education, shelter, drinking water & nutrition being accorded the remaining
Linkage to Poverty and Employment Generation
The impact on low income individual’s access to infrastructure depends on
the potions available, and the poor as a group have fewer or less
attractive options than the rich.
Alternative sources of service may be unavailable or unaffordable to the
poor.
Alternative sources such as water pump, private transport, kerosene
stoves or lighting or by moving to a better served nabourhood.
Public policies should aim at increasing the range of affordable options for
services of the type & quality required by the poor.
Impact on Technological Innovation
Information is considered a factor of production by itself and activities
involved with the processing & generation of information account for one
third to half of GDP & employment in OECD countries, and a growing
share of GDP in the modern sectors of LDCs.
Technological change, which has drastically reduced the cost of
communicating & expands the range of s services available, has also
reduced costs of transportation & many other telecommunications using
activities.
Employment Generation
To improve the welfare of the organized & unorganized labor, State could
consider some of the following options.
1. Promote small scale industries.
2. Increase the number of employment exchanges and job placement
agencies.
3. Facilitate investments by private sector for investements in vocational
training.
4. Promote training institutions & provide incentives for entrepreneurial
development.
5. Provide group insurance schemes for agriculture, construction and
unorganized workers.
Government initiatives - Employment
Following are the different schemes developed by the Government.
1) JRY Jawahar Rajgor Yojana
2) SJSRY Swarna Jayanti Shahari Rojgar Yojana
3) TRYSEM Training of Rural Youth for Self Employment
4) PMGY Pradhan Manti’s Gramodaya Yojana
Jawahar Rajgor Yojana (JRY)
In April 1989, GOI launched JRY after merging the National Rural
Employment Programme & Rural Landless Employment Guarantee
Programme.
The Second stream of JRY – Intensified Jawahar Rojgar Yojana – was
added in 1993 – 94.
The Third Stream of JRY – Innovative and Special Employment Scheme
(ISES), which was project specific.
Later JRY was modified to the Jawahar Gram Samriddhi Yojana.
The primary objective of these schemes is to provide employment to the
unemployed in the rural areas.
The secondary objective is the creation of sustained employment by
strengthening the rural economic infrastructure, creating community &
social assets, positive impact on wage levels & over all improvement in
the quality of life in rural Ares.
Income generating assets are created through a mix of bank credit.
The Ministry of Rural Development & Employment, GOI, administers
these schemes.
At the state level, the schemes are administrated by the rural department.
The commissioner Rural Development Department controls the
implementation & monitors the schemes.
District Rural Development Agencies (DRDAs) headed by the District
Magistrate in each district are responsible for implementation,
coordination and monitoring of the scheme in each district through
Panchayati Raj institutions & other executing agencies.
Swarna Jayanti Shahari Rojgar Yojana (SJSRY)
SJSRY aimed at providing gainful employment to urban employment and
unemployed.
SJSRY is funded on 75:25 bases between the center & the State.
Training of Rural Youth for Self Employment (TRYSEM)
The objective of this programme is to provide basic technical and
entrepreneurial skills to rural youth from families below the poverty line to
enable them to take up self employment/wage employment in the broad
fields of agriculture and allied sectors.
The target groups for this scheme are rural youths in the age group of 18-
35 years.
Pradhan Mantri’s Gramodaya Yojana (PMGY)
This scheme would focus on the creation of social & economical
infrastructure with the objective of improving the quality of life of people
especially in rural areas.
Programs related t health, education, drinking water; housing & rural
roads would be undertaken within this programme.
PMGY would have two components programme for rural connectivity with
50 % allocation and other programmes of primary health, primary
education, shelter, drinking water & nutrition being accorded the remaining
the potions available, and the poor as a group have fewer or less
attractive options than the rich.
Alternative sources of service may be unavailable or unaffordable to the
poor.
Alternative sources such as water pump, private transport, kerosene
stoves or lighting or by moving to a better served nabourhood.
Public policies should aim at increasing the range of affordable options for
services of the type & quality required by the poor.
Impact on Technological Innovation
Information is considered a factor of production by itself and activities
involved with the processing & generation of information account for one
third to half of GDP & employment in OECD countries, and a growing
share of GDP in the modern sectors of LDCs.
Technological change, which has drastically reduced the cost of
communicating & expands the range of s services available, has also
reduced costs of transportation & many other telecommunications using
activities.
Employment Generation
To improve the welfare of the organized & unorganized labor, State could
consider some of the following options.
1. Promote small scale industries.
2. Increase the number of employment exchanges and job placement
agencies.
3. Facilitate investments by private sector for investements in vocational
training.
4. Promote training institutions & provide incentives for entrepreneurial
development.
5. Provide group insurance schemes for agriculture, construction and
unorganized workers.
Government initiatives - Employment
Following are the different schemes developed by the Government.
1) JRY Jawahar Rajgor Yojana
2) SJSRY Swarna Jayanti Shahari Rojgar Yojana
3) TRYSEM Training of Rural Youth for Self Employment
4) PMGY Pradhan Manti’s Gramodaya Yojana
Jawahar Rajgor Yojana (JRY)
In April 1989, GOI launched JRY after merging the National Rural
Employment Programme & Rural Landless Employment Guarantee
Programme.
The Second stream of JRY – Intensified Jawahar Rojgar Yojana – was
added in 1993 – 94.
The Third Stream of JRY – Innovative and Special Employment Scheme
(ISES), which was project specific.
Later JRY was modified to the Jawahar Gram Samriddhi Yojana.
The primary objective of these schemes is to provide employment to the
unemployed in the rural areas.
The secondary objective is the creation of sustained employment by
strengthening the rural economic infrastructure, creating community &
social assets, positive impact on wage levels & over all improvement in
the quality of life in rural Ares.
Income generating assets are created through a mix of bank credit.
The Ministry of Rural Development & Employment, GOI, administers
these schemes.
At the state level, the schemes are administrated by the rural department.
The commissioner Rural Development Department controls the
implementation & monitors the schemes.
District Rural Development Agencies (DRDAs) headed by the District
Magistrate in each district are responsible for implementation,
coordination and monitoring of the scheme in each district through
Panchayati Raj institutions & other executing agencies.
Swarna Jayanti Shahari Rojgar Yojana (SJSRY)
SJSRY aimed at providing gainful employment to urban employment and
unemployed.
SJSRY is funded on 75:25 bases between the center & the State.
Training of Rural Youth for Self Employment (TRYSEM)
The objective of this programme is to provide basic technical and
entrepreneurial skills to rural youth from families below the poverty line to
enable them to take up self employment/wage employment in the broad
fields of agriculture and allied sectors.
The target groups for this scheme are rural youths in the age group of 18-
35 years.
Pradhan Mantri’s Gramodaya Yojana (PMGY)
This scheme would focus on the creation of social & economical
infrastructure with the objective of improving the quality of life of people
especially in rural areas.
Programs related t health, education, drinking water; housing & rural
roads would be undertaken within this programme.
PMGY would have two components programme for rural connectivity with
50 % allocation and other programmes of primary health, primary
education, shelter, drinking water & nutrition being accorded the remaining
Subscribe to: